Different loads demand different power-system decisions.

Patsons configures generator packages around the operating risk and load behavior of each application. The same kVA rating can require a very different enclosure, controls, redundancy, fuel and testing strategy depending on where it will operate.

IndustrialProcess loads
CriticalStandby power
RemotePrime power
ProjectCustom systems

Industries served

Power packages aligned to the operating environment

Construction & infrastructure

Robust prime or standby packages with transport, dust, fuel autonomy and changing site conditions considered.

Industrial facilities

Motor starting, process continuity, load steps, ventilation and safe maintenance access coordinated.

Data centers & critical facilities

Redundancy, fast start, sequence control, load acceptance, maintainability and witnessed testing.

Oil & gas

Project-specific hazardous-area equipment, shutdown interfaces, coating, containment and documentation.

Explore

Marine & ports

Corrosion protection, restricted access, lifting, exhaust routing and project electrical interfaces.

Commercial standby

Automatic start, transfer interfaces, acoustic limits, fuel storage and service planning.

Duty profile

Start with how the generator will actually be used

Start with how the generator will actually be used
Operating caseQuestions to resolve
Emergency standbyRequired start time, load steps, transfer sequence, fuel duration, exercise regime and redundancy
Prime powerAverage and peak load, annual hours, low-load exposure, maintenance windows and fuel logistics
Multi-set plantCapacity steps, reserve philosophy, synchronization, load sharing, shedding and expansion
Temporary / mobileTransport frequency, lifting, quick connections, weather, security and changing load conditions

Project brief

Five inputs that improve the first technical proposal

  1. 01

    Load

    Connected load, running load, largest motor, UPS or nonlinear loads and expected load steps.

  2. 02

    Duty

    Standby, prime, continuous or temporary operating profile and expected annual hours.

  3. 03

    Site

    Ambient temperature, altitude, dust, noise limits, access, footprint and indoor or outdoor location.

  4. 04

    Interfaces

    Voltage, frequency, switchgear, controls, fuel, exhaust, BMS and civil responsibilities.

  5. 05

    Acceptance

    Approved brands, standards, inspections, load test, witness points and handover documents.

Frequently asked questions

Technical questions, answered clearly

Final selections and compliance are confirmed against the project specification and approved technical submittal.

Which industries does Patsons Energy support?

Published experience covers power generation, industrial, marine, automotive, oil and gas and off-highway sectors, with projects for construction, development and critical infrastructure clients.

Is standby generator sizing different from prime power sizing?

Yes. Duty rating, expected hours, average load, overload allowance, redundancy and maintenance strategy differ. The same site load may lead to a different selection for standby and prime use.

Can Patsons build a multi-generator power plant?

Patsons’ project record includes multi-set systems totaling several megawatts. The design requires a defined operating philosophy, synchronization, switchgear interfaces, fuel system and staged testing plan.

Can the generator be customized for a restricted site?

Often, yes. Provide the access route, maximum dimensions and weights, final footprint, service clearances and connection points so the package can be assessed before design begins.